DP World’s Terminal 3 expansion at Jebel Ali Port required a robust security perimeter capable of withstanding vehicle impact at designated access control points. Our supply of 1,200 Jersey Barriers and 400 hoarding base blocks was completed in eight weekly deliveries across the 8-week perimeter construction programme.
All barriers were supplied with ADNOC-format traceability documentation alongside the standard RTA mill certificates — a requirement specified by DP World’s security compliance team for port installations.
Scope of Work
- 1,200 × 2m Jersey Barriers — impact-rated perimeter line
- 400 × 1000kg hoarding base blocks — access control points
- ADNOC-format + RTA traceability documentation
- Eight weekly delivery drops — crane-assisted placement